Reminder: Terrazzo Repair Work Continues in the Cafeteria

The next half of the Phase 9 of terrazzo repairs began the evening of Thursday, October 2nd.  Please refer to the attached map.  Work is expected to be completed by Wednesday, October 8th.

AREA F: October 2nd to 8th– WILL CLOSE OFF THE AREA AT THE BOTTOM OF THE GRAND STAIRCASE.  This will close access through the corridor and to the Cafeteria on Level 1.  – departments that would normally use this route for deliveries to Forensic Mental Health (FMH), e.g. N&FS, Pharmacy,
Housekeeping, etc., should utilize the dishwash room corridor and enter FMH via Corridor 1032, OR, go upstairs to Level 2 then back down to Level 1 via Elevator-01 at the East Entrance.

– STAFF ARE NOT TO USE THE FMH OR HOSPITALIST CORRIDORS TO ACCESS THE CAFETERIA

CODE RESPONSE ROUTES – ALL STAFF – please ensure that you review your normal response route and confirm your alternate route(s), if required.


Staff that enter/exit the facility via the East Entrance will have to follow similar detours as per previous phases, utilizing Elevator-01, Stair C and Stair-I.


SIGNAGE: During the closure at Area F, signage will be posted to detour patients and visitors to access the Cafeteria from all levels.  It would also be helpful and appreciated if staff could assist with wayfinding during this time. 

If you have any questions, please contact Kristi Judge in Capital Planning, at extension 7031 or kristi.judge@tbh.net or Darin Pretto at extension 6205 or darin.pretto@tbh.net.