Next Phase of Terrazzo Floor Repair

The next phase of terrazzo repair work will be completed in two separate sections. 

Area #1 is being at the back of the 1/3 cafeteria.  Please refer to map “P6” below. This section of work will take place from June 10-19.

Area #2 will be in front of the Grand Staircase covering up the entrance to the Main Corridor. Please refer to map “P5B” attached below. This work will take place between June 12-15. 

Work will begin the evening of Tuesday, June 10 and continue through to Thursday, June 19. Per previous, work will be occurring overnight from 8:00 p.m. to 6:00 a.m. and fencing will be placed around the work area for the duration of the timeframe to protect the area and equipment, and to ensure the safety of staff, patients and visitors.  

IMPACTS

  • Access will be detoured around for 2nd floor departments (2A, 2B, 2C, Ambulatory Care, Renal & DI) for units south of the Grand Staircase. Appropriate signage will be posted. 
  • Access to the 3rd floor through the Grand Staircase and elevator in the main hallway will be detoured. Access will be rerouted to D stair case or Elevator Near AMH- Access to the 1st floor by Elevator will be detoured to Elevator by AMH.- Access to back section of the Cafeteria 

Any questions, please contact Darin Pretto at darin.pretto@tbh.net.