The TBRHSC Maintenance Department will be conducting the 2-part annual electrical breaker maintenance switching on the evenings of: (1) TUESDAY JANUARY 9, 2024, and (2) TUESDAY JANUARY 23, 2024, from approximately 23:00 to 02:00 on each night.
All work associated with this maintenance effort is conducted in the 4th floor (penthouse level) of TBRHSC. During these times, there will be an electrical power supply disruption (either momentary or about 10-15 minutes) at various locations throughout all 4 levels of blocks B1 & B2 and C1 & C2 of the hospital. There are 4 main power feeds (2 normal & 2 emergency) and this maintenance will effect 2 of these feeds (1 normal & 1 emergency) so not all of the electrical loads within the shown (below) areas will be impacted by this maintenance.
Maintenance Employees will be on site during these time periods to deal with any unforeseen issues, if any should arise. If related problems are encountered during either of these events, please contact: JAMES ARRIL, Coordinator – Electrical, Control & Systems at CELL PHONE # 1-807-620-6925.
Should you have any questions in advance of this planned maintenance, please contact James Arril, per the contact information listed below. Thank you for your cooperation during this important & required maintenance event.

